This report was authored by Iván Cazarin and Dustin Duong
- Private equity firms own or back an estimated 25 percent to 30 percent of active U.S. data centers
- Private equity is backing half of the planned data center expansion
- In several states, private equity is backing large portions of data center capacity and expansion
- The five largest private equity firms backing data centers control nearly 20 percent of existing capacity and 30 percent of planned capacity
Table of Contents
- Executive Summary
- The combination of private equity and Big Tech endangers the safety and economic security of everyone else
- Private equity is fueling data centers’ community harms.
- The private equity model exacerbates accountability issues in the data center industry
- Data centers are increasingly unpopular and communities can fight back
- Recommendations
- Endnotes
Executive Summary
The relentless expansion of data centers to fuel the artificial intelligence (AI) boom has ignited a firestorm of opposition in communities across the country. While Big Tech claims that AI will multiply productivity, transform society, accelerate scientific and medical breakthroughs, and more, people are experiencing very different realities. A September 2026 poll found that 75 percent of U.S. adults are more concerned than excited about AI.[1] The mad rush to build sprawling AI data center complexes nationwide to benefit Big Tech and Wall Street investors—never mind the environmental and economic costs to local communities—is only increasing opposition. This pushback is likely to grow, as the total number of data centers in the United States is projected to balloon to 7,000 when the buildout is done,[2] a 67 percent increase from 2025.[3]
The data center boom is extremely resource intensive. Already, the land required for these enormous campuses—ranging from 40 acres for a small center to 1,000 acres for a hyperscale center[4]—is crowding out essential uses like farming and housing.[5] One company, Stream Data Centers, now owned by the private equity firm Apollo Global Management,[6] razed an entire neighborhood in Elk Grove Village, Illinois to erect a data center.[7] In addition to cannibalizing valuable land, data centers also deplete the water table,[8] drive up utility bills,[9] and emit greenhouse gases warming the planet.[10]
Private equity has been a largely hidden backer in the controversial AI boom and data center land rush. This first, comprehensive assessment of private equity ownership, investment, and private credit lending in the data center landscape uncovers that a set of giant private equity firms—interconnected with Big Tech companies—are behind a major portion of these developments.[11] It identifies the U.S. facilities that have private equity backing, explores the harms of these projects on the ground, and highlights places where people are organizing to fight back.
Key Findings
Private equity firms are investing billions of dollars to finance this data center buildout, and Big Tech firms are especially reliant on these Wall Street investors. We examined the private equity industry’s purchase of data center companies, investment in data center firms and facilities, and provision of private credit to data center operations as of the end of 2025[12] and found that:
1. Private equity firms own or back an estimated 25 percent to 30 percent of active U.S. data centers
As of December 2025, 78 private equity firms backed an estimated 13 to 17 gigawatts (GW) of active data center capacity across 670 data centers or campuses. These private equity-owned or -financed data centers make up an estimated 25 percent to 30 percent of the 54 GW of total U.S. active data center capacity.[13]
2. Private equity is backing half of the planned data center expansion
Private equity-owned or -financed companies have announced or initiated at least another 26.8 GW of U.S. data center capacity in development, under construction, or actively planned, amounting to over half of the total 50 GW of data centers in the pipeline by 2030.
3. In several states, private equity is backing large portions of data center capacity and expansion
Private equity firms own one third of the active data center capacity in Texas.[14] In Arizona, private equity controls almost half of current data center capacity and one third of planned expansion in the state.[15] In Virginia, private equity controls nearly one quarter of online capacity and over 10 percent of projects in development.[16]
4. The five largest private equity firms backing data centers control nearly 20 percent of existing capacity and 30 percent of planned capacity
The five largest private equity data center owners in the United States (by total active and planned capacity) are Brookfield Asset Management, Ares Management, Blue Owl Capital, DigitalBridge, and Apollo. These firms control or hold investments in 17 percent of existing capacity and 30 percent of planned capacity.
Tax giveaways to data center developments deprive states and localities of billions in much needed revenue in a time of draconian federal cuts. The state of Georgia lost $2.5 billion in tax receipts in just one year.[17] At the national level, as the share of economic activity and capital expenditure routed to this sector swells, overinvestment in AI may lead to financial instability if claims about usage and uptake fall short of projections or if data centers continue to meet with mass resistance. The prevalence of private equity financing for data centers—mostly drawing capital from public pension funds and university endowments—and the recent spate of AI companies vying for public listing raises significant concerns about how much exposure regular people have to this highly speculative sector through their retirement savings. If this bubble eventually pops, we risk repeating the hardships of the 2008 financial crisis, where Wall Street got rich from their gains and were bailed out, while communities and workers suffered the consequences of the financial industry’s greed.
The combination of private equity and Big Tech endangers the safety and economic security of everyone else
Big Tech has tried to obscure its threats to the economy and environment with irrational exuberance about what is fundamentally a speculative bubble. In an effort to demonstrate the benefits of their AI businesses to potential investors, Big Tech firms use specious revenue forecasts that do not provide an accurate sense of their financial stability, ignoring how the billions invested in their rapid expansion have yet to produce any profit. Furthermore, real-world demand for AI use may fall far short of the projections undergirding this rapid expansion. A March 2025 McKinsey report found more than 80 percent of businesses that have adopted generative AI technologies report no impact on their profitability.[18] As one industry analyst put it, “OpenAI is engaged in…the most dramatic case of ‘Fake it Till You Make It’ that we have ever seen…making huge commitments that they literally can’t afford.”[19] This is especially troubling given that AI companies represent a growing portion of the stock market, meaning that a bursting bubble will wreak havoc on the economy.
This financial instability is only amplified by an often-hidden source of data center financing: private equity. Private equity firms are Wall Street investment companies that pool large volumes of private capital to buy companies (through leveraged buyouts) or lend to them (termed private credit). As a quiet partner of Big Tech firms, private equity has been buying up data center companies, investing in data center campuses, and providing private credit to data center expansions. Lenders—both traditional banks and private credit—are also playing an outsized role in the boom, since one third of the projected three trillion dollars that will be spent on data centers by 2028 will be financed by debt.[20] In a frightening echo of the 2008 Great Recession, Wall Street is once again behind risky investments that have the potential to lead to a widespread financial crisis.
AI development requires significant capital outlays, including semiconductor chips used in processing computers, servers, and data storage in the data centers that house them, but the source of that funding has changed. Amazon, Alphabet, Meta, and Microsoft once owned one-third of all data center capacity and built most of the 5,000-server hyperscale data campuses over the past two decades.[21] Between 2021 and 2025, multiple Big Tech firms—Amazon, Alphabet, Meta, Microsoft, and Oracle, known for their massive, or hyperscale, data centers—quintupled their data center capital expenditures.[22] Now, these firms are shifting from owning and operating their own data centers to leasing much of their new capacity. A 2025 Morgan Stanley report estimated that only half of the total $2.9 trillion expected to be spent on new data centers between 2025 and 2028 will come from Big Tech firms.[23] More than a third—$1.1 trillion—is projected to come from private equity firms, either by offering private credit loans, launching joint ventures, or buying stakes in data center companies.[24]
This change in financing benefits both Big Tech and private equity firms. By outsourcing the land acquisition, permitting, construction, and operation of data centers to other companies, often owned by private equity, Big Tech effectively moves data center expansion costs off their balance sheets, providing an incomplete picture of their debt.[25] Meanwhile, private equity firms celebrate the demand for their capital. Blackstone, the world’s largest private equity firm, gushed, “AI is creating generational investment opportunities,”[26] and these investments increase the perceived value of AI, thus stimulating more investment, which fuels both AI hype and the risk of an AI bubble. Moreover, private equity firms already hold vast portfolios of oil and gas extraction, transmission, and electricity generation.[27] Now, they and data centers are expanding their fossil fuel extraction, power generation, and electricity delivery—including attempts to buy up public utilities.[28] By adding data center energy hogs to their portfolios, private equity firms can supercharge demand for the energy companies they own.
The private equity industry is a major driver of the data center building frenzy
Companies have long operated data centers to process business data and power cloud computing. But the AI demand for computational processing has massively outstripped the capacity provided by legacy computing hardware. This surge in processing demand and chip power has transformed data centers from small-scale operations to sprawling, resource-intensive facilities and campuses. To feed these power-hungry AI models, companies build or lease massive data centers.
By the end of 2025, private equity firms backed over 200 different data center companies worldwide, including some of the largest non-proprietary data center operators in the world. Blackstone boasted that its portfolio company QTS was the largest data center operator in the world as of June 2025.[29] Lending by private credit funds to AI-related sectors has grown rapidly, both in absolute terms and as a share of total private credit volumes. Outstanding loans to AI-related sectors have grown to over $200 billion today.[30]
The private equity industry touts its aggressive move into data centers. Apollo noted in its takeover of Stream Data Systems that it had a “strategy to scale our presence in digital infrastructure.”[31] Blackstone is banking on the AI boom, stating that its investments were “capitalizing on this generational opportunity and helping provide much needed compute capacity.”[32] (“Compute” is the industry term for computing power.) Ares, which has backed Vantage, EdgeConneX, and Powerhouse, said: “We see that the rapid growth in global data creation, from cloud storage to artificial intelligence (“A.I.”) applications, requires new investment into digital infrastructure across data centers.”[33] Similarly, Brookfield, which has backed Centersquare, Crusoe, and Compass, describes a “need” to push trillions of dollars to upgrade and maintain projects like data centers.[34]
Private equity firms have amassed data center market share by buying existing operators and consolidating them into larger companies, creating large new joint ventures with Big Tech partners or institutional investors, and funneling private credit into the sector (see Table 1.)[35] In 2025, private equity firms accounted for 90 percent ($56 billion) of the $61 billion spent globally on data center acquisitions and development.[36]
Table 1: Top Ten PE data center backers in the US (as of December 2025)
In the United States, private equity activity tallies up to a sizeable share of the data center industry. Nearly 80 private equity firms now own an estimated 13 to 17 gigawatts (GW) of active data center capacity across the United States in 670 sites. This makes up approximately 25 to 30 percent of the US’s 54 GW of current data center capacity. [37] (Fifty-four GW is enough to power more than 45 million homes in the U.S.) Private equity-owned or -financed companies have announced at least another 26.8 GW of data center capacity in development, under construction, or actively planned in the United States, [38] which is over half of the total 50 GW capacity expansion planned.[39]
Figure 1. Capacity of private equity-backed data centers and other U.S. data centers, by status (as of December 2025)
Table 2. Top ten PE-backed data center companies in the United States (as of December 2025)
Private credit is a critical part of the data center expansion, stoking the boom through large debt infusions and recurring financing, sometimes cycled through several private equity players. Since 2023, Blackstone’s private credit arm has pumped $12 billion in private credit loans to Coreweave, a publicly traded company that develops and owns 43 data centers.[40] In January 2026, Apollo’s private credit subsidiary MidCap Financial lent $3.5 billion to private equity firm Valor Equity Partners to finance its acquisition of data center infrastructure that it subsequently leased to xAI.[41]
Private equity is fueling data centers’ community harms
The aggressive data center expansion financed by private equity is amplifying the well-documented community harms these centers produce. These include climate and environmental impacts, such as site-specific pollution and water depletion for the communities surrounding these facilities, as well as increased greenhouse gas emission. Three cities have filed lawsuits against data centers for the around-the-clock noise from generators, cooling systems, and fans that can be heard up to a mile away.[42]
While data centers regularly threaten the health and safety of the communities they are located in, those that are owned or backed by private equity may have even less incentive to consider the harm they cause. The private equity business model of deep cost cutting, financial extraction, and heavy debt loads is specifically designed for rapid profit generation. This gives them little incentive to concern themselves with any negative outcomes that do not lessen the value of their assets.
Given that data centers are regularly sited in rural communities and communities of color, they can make existing racialized environmental injustices worse. There are nearly two dozen private equity data center projects online or in development in Dallas County Texas, a drought-prone area where Black communities already struggle with power-hungry crypto-mining data centers and the fossil fuel plants coming online to power them.[43] Several large projects are active or coming online in Douglas County and Fulton County, Georgia, where approximately half of the residents are Black or Indigenous. Private equity-backed data center companies operate a cluster of data centers north of South Fulton, a predominantly Black town where residents worry that data centers are “reshaping their neighborhoods without their consent.”[44] T5 Data Centers, backed by private equity firm Iron Point Partners, announced a data center in Palmetto, Georgia where nearby residents are concerned about the collapse of a regional water and sewer authority.[45] In Chicago, some of private equity’s largest data centers are planned for largely Black neighborhoods along the coast.[46]
One third of the active data center capacity in Texas, the fastest growing market in the country,[47] is controlled by private equity, and the state will soon have the largest volume of private equity-owned data center capacity. In raw numbers, Texas also has the largest Black population in the U.S.,[48] the second-largest Latino and Indigenous populations, and the third largest Asian American population. Private equity controls close to half of current data center capacity and one third of the planned expansion in Arizona. In Virginia, private equity controls a quarter of current capacity and a tenth of planned capacity, while in Pennsylvania, it controls 13 percent of planned data center capacity.[49]
Map 1. Private equity-owned or financed data centers in the United States (as of December 2025)
A downloadable list of private equity-backed projects and an interactive version of the map are available here.
Straining the electrical grid and offloading costs onto utilities customers
Artificial intelligence data centers are power hogs. The computational power to train AI models and perform AI tasks requires massive amounts of electricity to drive the chips and cool the facilities.[50] For example, a single ChatGPT query requires, on average, almost 10 times as much electricity as a traditional Google search, 2.9 watt-hours of electricity compared with 0.3 watt-hours. [51] In 2025, the 330 million daily U.S.-based[52] queries would have consumed 957 megawatt-hours, or about 350,000 MWh annually—enough to power over 32,000 homes for a year.[53]
Growing data center electricity demand has strained power grids and compromised reliability. A 2025 Inner City Fund report found that much of the country could experience shortages in power reserves that could undermine the reliability of electricity service.[54] In November 2025, the North American Electric Reliability Corporation warned that the constant demand from data centers could lead to winter brownouts if the grid could not support peak demand during cold snaps.[55] If major data centers suddenly switch to on-site generators during peak demand periods, it can create power load imbalances that can spur power outages.[56]
Higher data center demand is raising household electricity prices, as well. Residential customers are not only paying more for power as demand increases, but they are also subsidizing the power connections and upgrades to generation capacity needed to service data centers.[57] For example, the PJM regional power transmission organization charged residential customers $4.3 billion to fund data center grid connections and attributed its $23 billion in customer rate hikes to heightened data center demand.[58] PJM announced another round of $6.3 billion in rate hikes in July 2026 because of data center power demands.[59] A Bloomberg News analysis found that monthly electricity in areas located near large concentrations of data centers costs as much as 267 percent more than it did five years ago.[60]
Increased electricity demand drives higher fossil fuel emissions
The increased data center power demand is reversing the gains from clean renewable power, creating surging new demand for fossil fuel extraction and power production, and fueling increased climate emissions. Data centers themselves generate enough heat to raise surface temperatures near hyperscale facilities by nearly four degrees Fahrenheit.[61] The predominantly fossil fuel power sources are emitting huge amounts of carbon that heat the planet. A 2024 paper by researchers at the Harvard University School of Public Health found that more than half (56 percent) of the power for data centers operating in 2023 and 2024 came from fossil fuels.[62]
This heavy dependence on fossil fuel is artificially extending the use of coal-fired power plants and accelerating the construction of new gas-fired power plants. The Environmental and Energy Study Institute found that data center demand was handing coal a lifeline, reversing the retirement of 15 coal-fired power plants. [63] The Global Energy Monitor estimated that more than one-third of planned gas plants in 2025 were built to serve data centers, and a 2026 Environmental Integrity Project report found that 74 planned gas plants used to power data centers would release over 660 million tons of greenhouse gases annually—about the same as 140 million cars and trucks or Australia’s total greenhouse emissions. [64], [65] This added demand for gas-fired electricity generation is buoying and expanding the demand for gas drilling and fracking, worsening the climate crisis for decades to come. [66]
Figure 2. New data center capacity and solar capacity, megawatts (2024-27)[67]
Data centers suck communities dry
The chips that power AI servers generate sweltering amounts of heat and cooling these servers consumes massive amounts of water. A 2021 report estimated that U.S. data centers consume 449 million gallons of water per day and more than 160 billion gallons annually. This is likely an undercount, as less than a third of data centers measure their water consumption. [68] Reports from Google, Meta, and Microsoft estimate that in 2022 alone, these companies withdrew 580 billion gallons of water to power and cool data centers—enough water for the annual needs of 15 million U.S. households. [69]
The impacts are especially harmful for communities with high concentrations of data centers. A Bloomberg News analysis found that approximately two-thirds of new data centers built or in development since 2022 are located in areas already experiencing water shortages, including California, Arizona, Texas, Illinois, and Virginia. [70] Data centers in drought-stricken Texas consumed at least 49 billion gallons of water in 2025 and are projected to use as much as 399 billion gallons by 2030.[71]
While constructing one of the country’s largest data center complexes in Fayette County, Georgia, Blackstone’s QTS siphoned off early 30 million gallons of water without the knowledge of local officials. [72] Blackstone was found to owe nearly $150,000 in unpaid water bills. A QTS spokesperson claimed the extra usage was from a period of nine to 15 months, but county officials estimated that QTS had used this amount in just six months (see Figure 3). [73] The Flint Riverkeeper and local residents have sued the site for alleged violations of the Clean Water Act. [74] In Iowa, a QTS site drilled 40 unpermitted water wells that could deplete water resources and compromise firefighting capacity. [75]
Figure 3. Letter from Fayette County to QTS Realty Trust
The private equity model exacerbates accountability issues in the data center industry
The private equity industry is an increasingly powerful yet lightly regulated part of the U.S. economy. The private funds market grew sixteen-fold from $1 trillion in 2004 to over $16 trillion in 2025.[76] In 2024, private equity firms owned or backed 21,000 U.S. companies, nearly six times more than the 3,564 publicly traded U.S. companies.[77] In addition to amassing vast data center portfolios to capitalize on the projected demand, many private equity firms are also vertically connected to data center companies—either as suppliers (as owners of power plants, power generation companies, and of fossil fuel suppliers to power plants) or customers (businesses that may be deploying AI in their operations). Private equity firms may profit substantially from their data center investments, but their structure can make it difficult to hold them accountable.
The industry’s intentionally complex and opaque corporate structures are hard to monitor, as they conceal which firms control which data center assets. The Financial Times reported that “private equity is, almost by definition, an opaque asset class.”[78] Private equity firms include fully owned portfolio companies, platforms of similar or related portfolio companies, partial stakes in companies, joint ventures with other firms, and private credit loans to companies. These byzantine structures can obscure the ultimate owner, the relationships between private equity-controlled companies, or possible instances of self-dealing between data centers and other private equity-owned firms.[79] Private equity owners of data centers often insulate themselves from scrutiny and accountability through these veiled ownership structures and non-disclosure agreements. [80]
Private equity’s standard operating practices are likely to increase costs and risks for communities surrounding data centers. In addition to their debt-driven acquisition model and opaque lending practices, private equity firms engage in financial engineering that can fuel wealth extraction while leaving few resources for mitigation and remediation. Among these tactics are spurious fees and exceptionally aggressive cost-cutting. Such practices, if deployed, will likely only amplify the harms to residents and communities surrounding data centers.
Data centers are increasingly unpopular and communities can fight back
By now it has become clear that the public is fed up with Big Tech and Wall Street building data centers to increase their already substantial wealth while leaving the communities that house them with higher utilities, increased pollution, and water shortages. [81]A September 2026 PBS News, NPR, and Marist poll found that 70 percent of people oppose constructing data centers in their communities. [82] According to one data center tracker, at least 86 localities have implemented moratoria on data center construction since 2023, [83] and statewide moratoria have been announced for New York and Pennsylvania.[84] Private equity firms may be trying to cash in by breaking ground as quickly as possible before more communities block future projects, but some communities have already successfully defeated private equity-owned data centers including some in states with concentrations of private equity-owned facilities (see Figure 4).
Figure 4. Top 10 states with the most private equity-owned or -financed data centers, by capacity (as of April 2026)
Blackstone’s QTS withdrew its plan for a proposed data center development in DeForest, Wisconsin after organized opposition from local groups like No Data Centers in DeForest and 350 Wisconsin. [85] The data center complex was expected to use twice as much electricity as all of Dane County, Wisconsin’s second most populous and home to the state capitol, Madison.[86] Residents cited concerns over groundwater pollution, minimal permanent job creation, and rising utility rates.[87] DeForest’s Village President had allegedly been working behind the scenes with QTS to push the project through, despite claiming to be neutral.[88]
In Prince William County, Virginia, the Planning Commission denied a rezoning application for a proposed data center development by Blue Owl’s Stack Infrastructure following significant opposition from local groups like the Coalition to Protect Prince William County.[89] The volunteer-led organization highlighted issues with groundwater pollution, water and power consumption, and increased utility costs. [90] Virginia is home to one of the biggest concentrations of data centers in the country and the largest pool of private equity-owned and backed data centers with over 3.7 gigawatts of capacity.
Similar fights are ongoing nationwide. Residents of Doña Ana County in New Mexico are demanding transparency around the subsidies going to Stack Infrastructure’s Project Jupiter, a $165 billion data center development. [91] The project is being financed by $4.5 billion in Industrial Revenue Bonds issued by the Doña Ana County, which will own the site and lease it back to Project Jupiter. [92] Residents of Shreveport, Louisiana are protesting a $12 billion data center Stack Infrastructure is building for Amazon that is expected to use 57 million gallons of water annually (as of this writing, the city council overturned the permit denial, which was upheld in court).[93] Residents of Aurora, Illinois have won a noise restriction on data centers, including facilities owned by CyrusOne, which is backed by private equity firms, including BlackRock/GIP, KKR, and Pantheon Ventures.[94] In all, 40 percent of US data center projects due this year are at risk of being delayed.[95]
These examples are potent reminders that communities can come together to advance their own best interests and win. Policymakers can take cues from them as they address the speculative financing and community harms related to the data center buildout.
Recommendations
- States and localities should impose data center moratoriums to allow time to assess the environmental, social, financial, and community costs of data centers and to develop mechanisms to improve the approval process for data center facility planning, construction, and maintenance.
- States and localities should ban and repeal tax breaks or exemptions for data centers.
- Pension funds and other private equity and/or private credit institutional investors, like university and foundation endowments, should demand data center transparency, including a full list of the data center companies their private equity and private credit fund managers have backed, the facilities those companies currently own or have under development, the current energy consumption and key environmental metrics associated with those locations, the existence of any non-disclosure agreements (NDAs) signed by public officials in connection with their data center projects, and any instances of community opposition or concern about proposed or existing facilities.
- Localities should collect beneficial ownership information and comprehensive, audited information about the financial health of the ultimate parent company and any sole lessees for any currently operational, proposed, or already permitted data center developments in their jurisdiction and share that information, along with information about proposed subsidy amounts, with the public in an accessible format.
- Data center developers, their parent owners, and AI companies should be required to disclose key environmental and climate metrics for any data center capacity they own, lease, or operate, or plan to open.
Data center developers, their parent owners, and AI companies should be required to disclose key environmental and climate metrics for any data center capacity they own, lease, or operate, or plan to open.
Endnotes
[1] SSRS. CNN AI Poll. September 24, 2026.
2 American Edge Project, “America’s AI Surge: Powering Investment, Jobs, and Growth in Every State.”
[3] American Edge Project, “America’s AI Surge: Powering Investment, Jobs, and Growth in Every State.”
[4] Wisconsin Farm Bureau Federation. “Data center impacts on agriculture.” Available https://wfbf.com/policy/current-issues/state-agricultural-issues/data-center-impacts-on-agriculture/. Accessed April 19. 2026.
[5] Rowe, Niamh. “US farmers are rejecting multimillion-dollar datacenter bids for their land: ‘I’m not for sale.” Guardian. February 21, 2026.
[6] Available https://www.apollo.com/insights-news/pressreleases/2025/11/apollo-funds-complete-acquisition-of-stream-data-centers-3179224
[7] Parker, Will. Big tech is buying up America’s land—and home builders can’t compete. Wall Street Journal. February 17, 2026.
[8] Coletti, Leonardo et al. “AI is draining water from areas that need it most.” Bloomberg News. May 8, 2025.
[9] Saul, Josh et al. AI data centers are sending power bills soaring.” Bloomberg News. September 29, 2025.
[10] Shehabi, Arman et al. Lawrence Berkeley National Laboratory. “2024 United States Data Center Energy Usage Report.” December 2024
[11] Sam, Cedric et al. “A guide to the circular deals underpinning the AI boom.” Bloomberg Technology. March 11, 2026; Guevarra, Joyce, Kelly Morgan, and Shambhavi Gupta. “Private equity investment surge sends US data center deals to 5-year high.” S&P Global. May 12, 2026.
[12] Company ownership as of December 2025. Facility counts, capacity, status, and location were last verified in April 2026.
[13] International Energy Association. Energy and AI: Energy for AI. June 16, 2025. Available https://www.iea.org/data-and-statistics/data-tools/energy-and-ai-observatory?tab=Energy+for+AI. Accessed May 27, 2026.
[14] Aterio Data Products. ”U.S. data centers and power demand.” August 25, 2026.
[15] Aterio. “US data center Inventory by State.” 2026. Available at https://www.aterio.io/insights/us-data-centers/by-state. Accessed June 4, 2026. ; Cleanview. “Data Centers in Arizona.” 2026. Available at https://cleanview.co/data-centers/arizona. Accessed June 4, 2026.
[16] Cleanview. ”Data Centers in Virginia.” August 2026.
[17] Leroy, Greg et al. Good Jobs First. Data Center Tax Abatements: Why States and Localities Must Disclose These Soaring Revenue Losses.” April 2026.
[18] Singla, Alex, et al. McKinsey. “The state of AI: How organizations are rewiring to capture value.” March 12, 2025.
[19] Metz, Cade. The A.I. boom has found another gear. Why can’t people shake their worries?. New York Times. November 20, 2025.
[20] Metz, Cade. The A.I. boom has found another gear. Why can’t people shake their worries?. New York Times. November 20, 2025.
[21] Nicoletti, Leonardo et al. “AI data center gold rush driven by thousands of newcomers.” Bloomberg News. December 21, 2025.
[22] Blackstone, Inc. “Investing in the Picks and Shovels of AI.” January 2026. Available www.blackstone.com/wp-content/uploads/sites/2/2023/11/Investing-in-the-Picks-and-Shovels-of-AI.pdf?v=1769028783. Accessed April 22, 2026.
[23] Patkar et al, Morgan Stanley Global Fixed Income, Tech Diffusion, and GenAI. “Bridging a $1.5tr Data Center Financing Gap” 2025
[24] The remainder will come through corporate bonds and securitized credit issuance. Patkar et al. Morgan Stanley Global Fixed Income, Tech Diffusion, and GenAI. “Bridging a $1.5tr Data Center Financing Gap” 2025.
[25] Eren, Egenmen et al. “Financing the AI infrastructure boom: on- and off-balance sheet borrowing.”
BIS Quarterly Review. March 16, 2026.
[26] Blackstone, Inc. “Investing in the Picks and Shovels of AI.” January 2026. Available at www.blackstone.com/wp-content/uploads/sites/2/2023/11/Investing-in-the-Picks-and-Shovels-of-AI.pdf?v=1769028783. Accessed April 22, 2026.
[27] Oscar Valdés Viera, et. al. Americans for Financial Reform Education Fund. ”Private equity Ownership of U.S. Power Plants: A Hidden Climate Threat.” May 19, 2022. ; Private Equity Climate Risks. ”Private Equity Global Energy Company Tracker.” January 2026.
[28] Blackstone, Inc. “Investing in the Picks and Shovels of AI.” January 2026. Available www.blackstone.com/wp-content/uploads/sites/2/2023/11/Investing-in-the-Picks-and-Shovels-of-AI.pdf?v=1769028783. Accessed April 22, 2026.
[29] Blackstone Inc. ”Infrastructure.” Available at https://www.blackstone.com/our-businesses/infrastructure/. Accessed April 7, 2026.
[30] Aldasoro, et al, “Financing the AI boom: From cash flows to debt”. Bank for International Settlements. BIS Bulletin No. 120. January 7, 2026.
[31] Apollo. [Press release]. “Apollo funds complete acquisition of Stream Data Centers.” November 3, 2025.
[32] Blackstone. [Press release]. “Related Digital announces financing for $16 billion Oracle data center project in Saline Township, Michigan.” April 24, 2026.
[33] Ares Management Corporation. [White paper]. ”The Convergence of Digital Infrastructure and the Energy Transition.” June 2024. Available at https://web.archive.org/web/2/https://www.ares.com/content/dam/aresmgmt/resources/files/2024-06/Digital-Convergence-Green-Paper_June-2024.pdf.
[34] Brookfield. [Commentary]. “We’re (still) in a Golden Age of infrastructure investment.” March 2025. Available at https://www.brookfield.com/views-news/insights/were-still-golden-age-infrastructure-investment#domino-effect-AI
[35] Patkar, Vishwas et al. Bridging a $1.5tr Data Center Financing Gap. Morgan Stanley. July 16 2025.
[36] Roach, April. “Data center deals hit record $61 billion in 2025 amid construction frenzy.” CNBC. December 19, 2025.
[37] International Energy Association. Energy and AI: Energy for AI. June 16, 2025. Available https://www.iea.org/data-and-statistics/data-tools/energy-and-ai-observatory?tab=Energy+for+AI. Accessed May 27, 2026.
[38] [1] Szlezak, Waldemar et al. KKR. “Beyond the bubble: Why we think AI infrastructure will compound long after the hype.” November 2025.
[39] Singla, Alex, et al. McKinsey. “.” March 12, 2025.
[40] Coreweave. “AI data centers.” 2026. Available at https://www.coreweave.com/ai-data-centers. Accessed June 4, 2026. ; Coreweave. [Press release]. “CoreWeave Closes Landmark $8.5 Billion Financing Facility, Achieving First Investment-Grade Rated GPU-Backed Financing.” March 31, 2026. ; According to Pitchbook. Press releases for specific transactions:
CoreWeave. [Press release]. “CoreWeave Secures $2.3 Billion Debt Financing Facility led by Magnetar Capital and Blackstone to Meet Surging Demand and Ongoing Expansion of Specialized Cloud Infrastructure to Power AI.” August 3, 2023. ; CoreWeave. [Press release]. “CoreWeave Secures $7.5 Billion Debt Financing Facility led by Blackstone and Magnetar.” May 17, 2024. ;
[41] Apollo Global Management, Inc. [Press release]. “Apollo Backs $5.4 Billion Valor and xAI Data Center Compute Infrastructure Transaction with $3.5 Billion Capital Solution.” January 7, 2026.
[42] Hassan, Adeel. “The cloud has sound: The unrelenting and unseen cost of A.I. data centers.” New York Times. June 17, 2026.
[43] Climate Justice Alliance. ” What is AI and why do you keep hearing about it? And what are data centers? How are they connected?” March 28, 2025. ; Mahoney, Adam. ”Crypto-Mining Creates New Environmental Injustices for Black Texans.” Capital B News. July 9, 2024.
[44] Sung, Morgan, Maya Cueva, Chris Egusa, Chris Hambrick. ”How the AI Data Center Boom Impacts Black Communities.” KQED. March 10, 2026. ; Davis, Danielle. ” AI Data Centers Are the New Environmental Burden Black Communities Didn’t Ask For.” Essence. January 20, 2026.
[45] Johnson, Alyssa. “Black Community in South Fulton Fights Georgia’s Data Center Boom.” Capital B News Atlanta. September 25, 2025.
[46] Healy, Bill. ” Where we are: Mapping Chicago’s racial divisions.” WBEZ Chicago. May 9, 2012.
[47] Bloom Energy. 2026 Data Center Power Report. January 2026.
[48] Martinez, Grace, and Jeffrey S. Passel. “Facts About the U.S. Black Population.” Pew Research Center. January 23, 2025.
[49] Cleanview. ”Data Centers in Virginia.” August 2026. ; Cleanview. ”Data Centers in Pennsylvania.” August 2026.
[50] Epoch AI “Frontier AI Model Compute Usage” 2026 ; Steward, Duncan et al. Delotte. “Why AI’s Next Phase Will Likely Demand More Computational Power, Not Less.” November 18, 2025.
[51] Goldman Sachs. “AI is poised to drive 160% increase in data center power demand.” May 2024.
[52] Roth, Emma. “OpenAI says ChatGPT users send over 2.5 billion prompts every day.” The Verge. July 21, 2025.
[53] Silberling, Amanda. “ChatGPT.” TechCrunch. July 21, 2025; U.S. Energy Information Administration. “Frequently asked questions: How much electricity does an American home use.” January 8, 2024 .
[54] Batra, Lalit et al. Inner City Fund “Rising Current: America’s Growing Electricity Demand.” 2025 at 8.
[55] Li, Katherine. “The spike in data centers is one of the main contributors to electricity demand and blackout risks this winter.” Business Insider. November 19, 2025.
[56] McLaughlin, Tim. “Big tech data center boom poses new risk to US grid operators.” Reuters. March 19, 2025.
[57] Peskoe, Ari, Eliza Martin, Harvard Environmental & Energy Law Program. “Extracting profits from the public: How utility ratepayers are paying for big tech’s power.” 2026
[58] Jacobs, Mike. Union of Concerned Scientists. “Connection Costs policy brief.” September 2025; Monitoring Analytics LLC for PJM. “State of the Market Report for PJM.” May 14, 2026 at 2. Available at https://www.ucs.org/sites/default/files/2025-09/PJM%20Data%20Center%20Issue%20Brief%20-%20Sep%202025.pdf.
[59] Penn, Ivan. “Data centers to add billions in power costs in 13 states.” New York Times. July 14, 2026.
[60] Clemmer, Steve et al. Union of Concerned Scientists. “Data center power play.” January 21, 2026.
[61] Paddison, Laura. “Scientists have found an alarming environmental impact of vast data centers.” CNN. March 30, 2026.
[62] Guidi, Gianluca et al. “Environmental Burden of United States Data Centers in the Artificial Intelligence Era.” November 14, 2024.
[63] Yañez-Barnuevo, Miguel. Environmental and Energy Study Institute. “Data Center Buildout Is Hungry for Fossil Fuels” January 26, 2026.
[64] Martos, Jenny. Global Energy Monitor. “Betting big on data centers, U.S. now leads world for new gas power development.” January 2026.
[65] Bird, Griffin et al. Environmental Integrity Project. “The Power Behind AI.” July 2026.
[66] Storrow, Benjamin. “Trump and AI spark a natural gas boom.” E&E News. July 6, 2026.
[67] Goldman Sachs. “US data center power demand projected to double by 2027.” May 20, 2026; U.S. Energy Information Administration. “Electric Power Annual 2024.” October 2025 at Table 4.5 and Table 4.6.
[68] Mitton, David. “Data Centre Water Consumption” 2021.
[69] Murray, Ben, DiFelice, Mia. Artificial Intelligence: Big Tech’s Big Threat to Our Water and Climate. Food and Water Watch. April 9, 2025.
[70] Nicoletti, Leonardo, Michelle Ma, and Dina Bass “AI is draining water from areas that need it most” Bloomberg. May 8, 2025.
[71] Burman, Theo. “.” Newsweek. August 1, 2025; Gory, Jon. Lincoln Institute of Land Policy. “” October 17, 2025.
[72] Cummings, Ciara. ”Records raise questions about Georgia’s largest data center and its water use.” Atlanta News First. July 13, 2026.
[73] White-Stevens, Ellie. “Behind Fayette’s QTS Water Controversy: A Missed Meter, 8,000 Workers and a Massive Construction Project.” The Citizen. May 11, 2026. ; Skibell, Arianna. ”A data center drained 30M gallons of water unnoticed — until residents complained about low water pressure.” Politico. May 9, 2026.
[74] Raymond, Jonathan. ”Environmental group, residents file notice of intent to sue QTS data center in Fayetteville alleging violation of Clean Water Act.” 11Alive. June 5, 2026.
[75] Tabick, Brian. “State and county investigating potentially illegal wells near data center construction site.” KCRG ABC Channel 9. Cedar Rapids, Iowa. July 21, 2025.
[76] McKinsey & Company. “A routinely exceptional year: McKinsey Global Private Markets Review.” February 2017; McKinsey & Company. “Global Private Markets Report 2026: Clearer view, tougher terrain.” February 10, 2026.
[77]E&Y for the American Investment Council. “Economic Contribution of the U.S. Private Equity Sector in 2024.” June 2025 at 1; Center for Research in Security Prices, LLC. “CRSP Market Indexes US Market Update December 2022.” December 2024 at 6.
[78] Greene, Sophia. “Private equity: The definition of an opaque asset class.” Financial Times. January 24, 2015.
[79] Becher, Brooke. Circular financing is quietly fueling the AI boom. Here’s why that could be a problem. Built In. April 21, 2026; Sam, Cedric et al. A guide to the circular deals underpinning the AI boom. Bloomberg Technology. January 22, 2026.
[80] Kainz, Natalie. “How NDAs keep AI data center details hidden from Americans.” NBC News. October 28, 2025.
[81] Waldman, Oscar. ”The people have spoken–and they said they hate data centers.” Food and Water Watch. May 18, 2026.
[82] Jones, Jeffery. ”Americans oppose AI data centers in their area.” Gallup. May 13, 2026.
[83] Interconnected Capital, LLC. ”US data center moratorum tracker.” Available https://www.interconnectedcapital.com/research/data-center-moratoriums. Accessed May 29, 2026.
[84] Ward, Jasper. “New York becomes the first state to impose a data center moratorium.” Reuters. July 14, 2026.
[85] Moris, Madison. ”DeForest residents organize to stop proposed data center after emails go public.” Daily Cardinal. January 22, 2026.
[86] Beran, Liam. ”Vienna data center could use 2.5x the energy consumption of Dane County, says official.” Isthmus. October 21, 2025.
[87] Moris, Madison. ”DeForest residents organize to stop proposed data center after emails go public.” Daily Cardinal. January 22, 2026.
[88] Aldana, Renee. ”Ethics complaint filed against DeForest Village President over QTS proposal.” WKOW. February 3, 2026.
[89] Kraft, Sebastien. Prince William supervisors deny Bristow Campus data center following protest. Inside NOVA. September 10, 2025.
[90] The Coalition to Protect Prince William County. ”About Us.” Available https://protectpwc.org/about-us/about-the-coalition-to-protect-pwc/. Accessed May 29, 2026.
[91] Salas, Jordan. Residents demand transparency for $165 billion Santa Teresa data center. CBS4 News. September 17, 2025.
[92] Mason, Thomas. Banks meeting data center demand with billions in credit facilities, bonds. S&P Global Market Intelligence. February 27, 2026.
[93] Boucher, Makenzie and Greg Hilburn. Protesters speak out against Northwest Louisiana data centers. Shreveport Times. February 23, 2026; Swaine, Liz. “Data center in west Shreveport back on track: Judicial review fails in court.” Shreveport-Bossier City Advocate. April 21, 2026.
[94] Swinhoe, Dan. ”KKR & GIP close $15bn CyrusOne acquisition.” Data Center Dynamics. March 29, 2022.
[95] Rosner-Uddin, Rafe et al. Data centre delays threaten to choke AI expansion. Financial Times. April 16, 2026.